Estimate check list
Pipeline Work Estimate QC
Comprehensive checklist for deposit work, utility shifting, and other pipeline projects
0% Complete
General Requirements
Verify all drawings are included and properly referenced
Check that all measurements are accurate and match drawings
Confirm all rates are as per current schedule of rates (SOR)
Verify contingency amount is included (typically 3-5%)
Check for proper work description against each item
Type of Work Selection
Select the type of work:
Final Verification
Review all calculations for arithmetic accuracy
Verify all necessary approvals and signatures are in place
Check that the estimate follows departmental formatting standards
Confirm all referenced documents are attached